Pile Extraction Clamp

PEC

PILE EXTRACTION CLAMP

Finished the extraction of sheet piles safely and productively. Once extracted the piles can be laid down precisley where required, avoiding the pitfalls of releasing piles from the jaws of a vibrator.

 

 

PILE EXTRACTION CLAMP WEIGHTS AND DIMENSIONS
MODEL MAXIMUM EXTRACTING FORCE SWL WEIGHT OF CLAMP PART NUMBER 4LIFTING HOLE IN PILE
20T 20 tonne 2.5 tonne 305 kg PEC 20T MIN Ø40mm 150mm FROM PILE TOP
40T 40 tonne 2.5 tonne 500 kg PEC 40T MIN Ø35mm 150mm FROM PILE TOP