PEC
PILE EXTRACTION CLAMP
Finished the extraction of sheet piles safely and productively. Once extracted the piles can be laid down precisley where required, avoiding the pitfalls of releasing piles from the jaws of a vibrator.
PILE EXTRACTION CLAMP WEIGHTS AND DIMENSIONS | |||||
---|---|---|---|---|---|
MODEL | MAXIMUM EXTRACTING FORCE | SWL | WEIGHT OF CLAMP | PART NUMBER | 4LIFTING HOLE IN PILE |
20T | 20 tonne | 2.5 tonne | 305 kg | PEC 20T | MIN Ø40mm 150mm FROM PILE TOP |
40T | 40 tonne | 2.5 tonne | 500 kg | PEC 40T | MIN Ø35mm 150mm FROM PILE TOP |